The heliopark El Encimero is located in the town of Mendavia (Navarra. Spain). It has a total installed power of 1.591 Kw.
The technology used in this park consists of photovoltaic panels supported by two axis tracking systems, allowing an annual generation of 3,481,414 Kwh of clean and renewable energy.
Its construction was carried out in two consecutive phases, the first one (1.254 Kw) in March 2007 and the second one (345 Kw) in June 2008.