Heliosolar has started the building of a photovoltaic Heliopark™ in the town of Campolara, Burgos (Spain) with a power of 1.500 Kw after obtaining its classification according to the Ministry of Industry’s pre-assignment.

The construction work has started in November 2010 and the installation is expected to be completed for its connection to the network in the first quarter of 2011.

The project is being developed on 45 000 m² where photovoltaic modules over fixed structure will be used for its construction. The total energy production per year of this Heliopark™ will be 2.486.606 Kwh.

The total investment for this installation amounts to 6.800.000 euro.

Plano de la instalación
Installations photo
Specifications
Type of installation > Solar farm
Technology > Photovoltaic
Total Power > 1.700 Kw
Structure > Fixed structure
Annual Production > 2.486.606 Kwh
Connection > 1Q 2011